Looking forward to spring,
Today I signed the 2017 lease and work plan to get the bottom painted, the top cleaned and waxed and every thing ship shape for a March 1 launch.
I sure hope the spring comes early but if not I plan to redo the control panel under the hatchway and change the rest of the cabin lights and I can do that with the boat in the water even if the weather is cold (I do have an electric space heater).
Wish me luck
Talked to HPM yesterday and we are on track for early March, if weather does not block anything.
Beta Marine shipped in new fuel filter mount, I will try and get down there to install before to long.