Getting close now

Just a week from March, and we are due to be back in water 1st week of March.

The new control panel is cut out and read for components to mount and install back in boat. Pat is out of town from Friday on so I will try and do the install and wiring on Sat/Sun. I will post pictures when done. Also I am pulling the old cabin lights out and putting in new LED ones which will save power.

Ordered bad weather gear today just in case (plus it was on sale at West Marine).
RSN

Setting the clock for Spring

Looking forward to spring,

Today I signed the 2017 lease and work plan to get the bottom painted, the top cleaned and waxed and every thing ship shape for a March 1 launch.

I sure hope the spring comes early but if not I plan to redo the control panel under the hatchway and change the rest of the cabin lights and I can do that with the boat in the water even if the weather is cold (I do have an electric space heater).

Wish me luck